Serving the Bay Area Since 2020: San Francisco • San Mateo • Daly City • San Jose • San Leandro • Hayward • Fremont Local crews • 24/7 emergency response
SAFENEST Restoration home 24/7 Damage
Restoration
Water • Fire • Mold
Menu
Emergency line(650) 514-1616
Call Now
500+Completed Projects
LEAD-SAFENAT-F243096-1
Restoration pricing reference

Xactimate Price List for Bay Area Water Damage Restoration

See published line-item pricing for common mitigation work, including emergency calls, structural drying equipment, containment, demolition, cleaning, and debris removal.

How Xactimate pricing works

A familiar format for restoration invoices and insurance review.

Xactimate® is estimating software used across property restoration, construction, and insurance claims. It organizes labor, equipment, and material costs into standardized line items, helping contractors and insurance adjusters review the scope of damage and proposed work in a consistent format.

SAFENEST prepares Xactimate invoices when documenting covered restoration work. A clearly itemized invoice can make it easier for homeowners, restoration professionals, and claim representatives to understand which services are included and how the final cost was calculated.

Water mitigation and restoration price list

Xactimate service, unit, and price list effective June 12, 2024 for ZIP Code 94010.
Service Price
INITIAL INSPECTION
Emergency service call - Monday-Friday 8:00 a.m. - 5:00 p.m.EA271.33
Emergency service call - after business hoursEA407.00
ACCESS TO WORK
Content Manipulation charge - per hourHR77.23
AIR SCRUBBER
Negative air fan/Air scrubber (24 hr period) - No monit.DA80.57
Add for HEPA filter (for negative air exhaust fan)EA231.93
Carbon vapor filter (for air scrubber) - 16" x 16"EA84.01
EQUIPMENT SETUP
Equipment setup (hourly charge)HR96.83
EQUIPMENT MONITORING
Equipment monitoring (hourly charge)* minimum 3 hr per visitHR96.83
EQUIPMENT
Air mover (per 24 hour period) - No monitoringEA38.00
Dehumidifier (per 24 hr period) - 70-109 ppd - No monitoringEA83.54
Wood floor drying extraction mat (per 24 hr prd) No monitoringDA181.75
Fill holes created by wall cavity dryingEA2.38
Wall cavity drying-Dctd type (per 24 hr period) No monitoringDA76.50
Wall cavity drying-Inj. type (per 24 hr period) No monitoringDA141.00
Drill holes for wall cavity dryingEA0.96
CONTAINMENT
Containment Barrier - tension post - per dayDA3.35
Peel & seal zipperEA17.41
Containment Barrier/Airlock/Decon. ChamberSF1.47
PROTECTION
Floor protection - self-adhesive plastic filmSF0.72
Floor protection - heavy paper and tapeSF0.50
Protect - Cover with plasticSF0.47
REMOVAL
Water extraction from hard surface floorSF0.33
Water extraction from carpeted floorSF0.69
WALLS
Tear out trimLF0.91
Tear out baseboardLF0.91
Tear out wet drywall, cleanup, bag for disposalSF1.64
Tear out wet drywall, cleanup, bag, per LF - up to 4' tallLF8.73
Tear out wet drywall, cleanup, bag, per LF - up to 2' tallLF6.18
Add for wet drywall on high walls - 11' to 14' highSF0.31
Add for wet drywall on high walls - 14' to 20' highSF0.42
Tear out wet plaster, cleanup, bag for disposalSF3.79
Tear out and bag wet insulationSF1.24
FLOORS
Tear out tackless strip and bag for disposalLF1.70
Tear out wet non-salvageable carpet, cut & bag for disposalSF1.02
Lift carpet for dryingSF0.70
Tear out wet carpet pad and bag for disposalSF0.95
Tear out non-salvageable tile floor & bag for disposalSF6.34
Add on to tear out mortar bed for tileSF3.12
Tear out non-salv solid/engineered wood floor & bag for disposalSF6.37
Tear out non-salv floating floor & bag for disposalSF3.22
Tear out non-salv underlayment & bag for disposalSF2.77
BATHROOM
Tear out cabinetry - vanityLF16.05
Toilet - DetachEA86.53
Gas/water line cap/plug - per capEA24.19
Remove Plumbing fixture supply lineEA8.46
Dishwasher - DetachEA96.78
Remove Garbage disposerEA42.33
Sink - single basin - DetachEA51.67
Cabinet - lower (base) unit w/shoring - DetachEA54.23
KITCHEN
Range - freestanding - electric - DetachEA37.34
Refrigerator - DetachEA49.77
Cabinet - upper (wall) unit - DetachLF29.94
Tear out cabinetry - lower (base) unitsLF16.05
Cabinet - full height unit - DetachLF34.87
CLEANING
HEPA Vacuuming - Light - (PER SF)SF0.59
Apply anti-microbial agent to the surface areaSF0.45
Clean floorSF0.80
Mask and cover register / air returnEA6.11
Sink - undermount - DetachEA85.36
Add on to tear out tile concrete shower curb - per LFLF13.35
Add on to tear out tile framed shower curb - per LFLF20.03
Temporary water heater - (Bid Item)EA2260.00
EQUIPMENT TAKE DOWN
Equipment takedown (hourly charge per tech)HR96.83
EQUIPMENT CLEANING AND DECONTAMINATIONEA70.57
DEBRIS REMOVAL
Haul debris - per pickup truck load - including dump feesEA266.85
Single axle dump truck - per load - including dump feesEA554.32
Dumpster load - Approx. 20 yards, 4 tons of debrisEA904.52
GENERAL ITEMS
Eye protection - plastic goggles - DisposableEA10.93
Personal protective gloves - Heavy duty (per pair)EA7.50
Plastic bag - used for disposal of contaminated itemsEA3.52
LABOR MINIMUMS APPLIED
General labor - labor minimumEA38.74

Xactimate® is a registered trademark of its respective owner. SAFENEST is not affiliated with or endorsed by Xactimate.

Need a project-specific Xactimate invoice?

Call SAFENEST to discuss the damage, document the scope, and schedule an assessment.

Call Now: (650) 514-1616
Call NowCallback